Mariaschool Amsterdam from school building to social housing

What used to be the Mariaschool Amsterdam school building is located in Admiraal de Ruyterweg in Amsterdam West. This Roman Catholic boys’ school was founded in 1915 following approval from the Bishop. It was designed by architect P.J. Bekkers, who also designed the adjacent church and parsonage. The building was extended again in 1926.*

Transform vacant municipal real estate

Until 2016, the school building was owned by the City of Amsterdam. At that time, the City Council decided to transform vacant office buildings and municipal real estate in order to create accommodation for refugees who had been granted residence permits. The former school building was seen as a suitable solution and was sold to Rochdale.

From school building to social housing apartments

The aim was to create 30 social housing apartments in the school building. Each individual unit will have a surface area of 24 sq. m. and will be suitable for young people, students and newcomers to the housing market.

Foundations according to the F30 Protocol

Our work started in 2016 when a foundation survey was conducted. This was based on foundation inspections conducted by Fugro. The aim of our inspection was to determine the quality of the existing foundations according to the F30 Protocol. The foundations turned out to be of mediocre quality, because some piles were seriously affected by bacteria. In view of the planned renovation, we recommended carrying out a complete foundation repair.

Structural calculations, from provisional- to definitive design

In 2018, we again became involved in this project: taking responsibility for the structural calculations and drawings to enable Rochdale to apply for its environmental permit.

When the environmental permit was in place, and Rochdale had chosen a contractor to carry out the work, we developed the provisional design for the building’s planning application into the definitive design.

EversPartners' contribution

Our experience in foundation repairs and our flexibility to cope with the surprises emerging during demolition and/or execution ensured that we were just the right partner to take on this work.

* source: Het Nieuwe Instituut

Client
Rochdale

Contractor
Ooijevaar

Location
Admiraal de Ruyterweg, Amsterdam

Year
2016 – Foundation survey
2018 – Structural drawings and calculations
2019 – From provisional design to definitive design

Other constructive engineering projects

Spaarndam 2 restoration

Spaarndam 2…

Continuation of a successful collaboration
Koudwals 21

Koudwals

The upgrade of the cold rolling system Tata Steel
Bos & Lommerweg

Bos & Lommerweg

Renovation of bay windows
Amsterdam Amstel station hall

Amstel station

Engineering a national listed monument
Albert Heijn in Anklaar

Albert Heijn in…

Everything ready in time for the grand opening
Engineering van een autowasstraat Heerhugowaard

Modern carwash

From caravan showroom to ultramodern carwash
Het Schip BIM

Het Schip BIM

Lean planning and collaboration
Holland Spoor Den Haag

Albert Heijn

Extention of Albert Heijn under the A8 motorway
Appartementen Velsen

Renovation

Renovation of 81 apartments from 1950
De Broeckgouw Keetzijde

Czaar Peterstraat

Extensive renovation in BIM
Tata Steel

Industrie hall

Action plan in Revit
Wateraccumulatie

Solar panels

Solar panels calculation & advice
Sonneborn refined products

SAB Hall

The power of cooperation
LA verzendhal tata Steel

New building AH

The most beautiful grocery store of The Netherlands
Zaandijkerkerk

Zaandijkerkerk

Church restored and given a residential function