Tata Steel analytical laboratory
Tata Steel decided to build an analytical laboratory in IJmuiden. The new building was necessary because the new analysis machines were no longer suitable for the old location. The new building is an extension of the first floor of the existing office building of the Oxystaalfabriek.
Glass construction
The construction will largely be made of glass. The extension has a surface of 350 m2 and is one floor high.
Client
Tata Steel IJmuiden
Location
IJmuiden
Activities
Structural Engineering
Project management
Modelling
Other industrial projects
Shipping Hall
Solution for maximum logistics capacity
Industrie hall
Action plan in Revit
Solar panels
Solar panels calculation & advice
SAB Hall
The power of cooperation
9 Bruggetjes
Constructive engineering & environmental permit
Sonneborn
Modernisation down to the last detail
Daalimpex
Constructive engineering new cold stores