We have upgraded the existing uninsulated hall to a durable and insulated hall. We also ensured that more sun and daylight could shine in the industrial hall.
Action plan in Revit
Our engineers carried out a thorough inspection of the current construction and its quality on site. The existing hall was scanned, after which the model was set up in Revit.
To see the effect of using window strips in the roof and/or in the wall, different scenarios were made, so that the customer had ample choice.
Advice
When discussing the options, we gave advice based on a careful consideration between the cost, the most beautiful and best solution.